General FAQ

+ System features?

  • Supplied Complete
  • Pre-Engineered
  • Ready for On-Site Assembly
  • Turnkey systems
  • Turnkey Skid Mounted System
    (All supporting equipment mounted / pre-connected /
    tested as a unit before shipping)
  • Retrofit existing DAF tanks for increased capacity
  • Lowest horsepower of any flotation technology
  • Energy conservation
  • "Green" technology
  • Simple ON/OFF operation
  • Fully automated
  • Options for remote monitoring

+ System components?

  • System Feed Pump
  • Influent Flow Meter
  • Dual Compartment Conditioning Tank
  • Plug Flow Serpentine Contact Chamber
  • Coagulant Metering Pump
  • Polymer Activation / Aging System
  • Series F Suspended Air Emulsion Generator
  • Series CF ClearFloater Flotation Cell
  • Series DWC Dewatering Conveyor
  • Skimmed Solids Pump

+ What is the tank material?

Stainless steel

+ What is the pump motor size?

0.25 to 10 hp

+ How about the flow capacity?

Up to 8000 gpm

+ What is the hydraulic loading rate?

Up to 18 gpm/ft²

+ How about the solids loading rate?

Up to 30 lb/hr/ft²

+ What about suspended solids?

Up to 20,000 mg/L (2%)

+ Removal rates?

Greater than 90%

+ Flotation surface area?

8 to 432 ft²

+ Thickness?

Minimum 12 gauge

+ Length? Width? Height?

L = 7'-5" to 58'-6"
W = 4'-6" to 11'-6"
H = 7'-0" to 12'-9"

+ Pipe size?

3" to 18"

+ Voltage?

220 VAC
480 VAC

+ Phase?

1, 3

+ Current?

5 to 50A

+ Additional options?

pH Sensor / Controller
Acid / Base Metering Pumps
Bottom Solids Auger

+ What about mounting?

Skid - All equipment mounted / pre-plumbed / pre-wired / tested
Trailer
Separately Placed
Field Assembly

+ Typical lead time?

4 to 5 months
Can be shortened.